Katies Studying Abroad

Thursday, July 15, 2010

getting down to nuts and bolts

























































Before the tubes were installed Tamsie drilled holes that were measured by the crew and then she and the guys drilled holes into the flooring of the car and filled them with bolts and flat panels of steel to support the cast iron above the car. To prevent leakage the molten iron would never touch the actual floor of the car, but would stop at a 2" sand floor.

No comments:

Post a Comment